| MOQ: | 10 pcs |
| Price: | Negotiable |
| Standard Packaging: | Plywood case |
| Delivery Period: | 15 working days |
| Payment Method: | L/C, T/T |
| Supply Capacity: | 1000 pcs/ week |
YDG Girder Stacking Clamp
Clamp for the horizontal lifting of steel structures(also can be used for any structured steels
Manufactured from high quality carton steel
Avoid snatch or shock loading
H-beam lying on the their sides can be lifting and handled horizontally
![]()
| Model | WLL (ton) | Jaw opening (mm) | Weight kg |
| 1t | 1 | 0-24 | 7 |
| 2t | 2 | 0-30 | 11 |
| MOQ: | 10 pcs |
| Price: | Negotiable |
| Standard Packaging: | Plywood case |
| Delivery Period: | 15 working days |
| Payment Method: | L/C, T/T |
| Supply Capacity: | 1000 pcs/ week |
YDG Girder Stacking Clamp
Clamp for the horizontal lifting of steel structures(also can be used for any structured steels
Manufactured from high quality carton steel
Avoid snatch or shock loading
H-beam lying on the their sides can be lifting and handled horizontally
![]()
| Model | WLL (ton) | Jaw opening (mm) | Weight kg |
| 1t | 1 | 0-24 | 7 |
| 2t | 2 | 0-30 | 11 |